XH200

XH200

As mines and quarries go deeper, the Extra High Head automatic-priming, solids-handling pump set is designed to de-water more efficiently and effectively.

Boasting one of the best shaft stiffness ratios of any automatic priming pump on the market, its range provides the reliability to meet market expectations.

  • Low fuel usage
  • Reduced engine sizes
  • Lower maintenance costs
  • Dry self prime and reprime
  • Close coupled SAE bearing frames
  • Operates in ‘snore’ conditions
  • Vacuum Priming option available for ground de-watering.
Clear

Not sure where to start?

WHY Sykes Group?

award icon

DIRECT COMMUNICATION

Our in-house engineers and tech experts will work with you to create bespoke solutions for your project.

diamond icon

PREMIUM SPECIFICATIONS

Our pumps are designed to handle the most challenging and demanding environments. Using our in-house engineering team, we can custom-design pump packages to match any specification.

dollar icon

OPERATION AND MAINTENANCE COSTS

We design and manufacture pump packages that delivers optimal efficiency and minimal downtime. Even operating in harsh conditions, our products provide a safe and cost-effective solution.

menu icon

EQUIPMENT RANGE

We provide a wide range of pumps to handle all types of water-based issues. Whether above or below ground, Sykes Group can offer a solution.

shopping cart Icon

CUSTOMER SERVICE AND AFTERMARKET

If you need advice on a particular part, our parts and customer service technicians are always available to offer qualified, professional advice.

setting icon

STOCK AND MANUFACTURING

As the original equipment manufacturer (OEM), we keep plenty of stock on hand and can provide quick access to the parts you need.

Product Enquiry

GET A QUOTE

CHECK AVAILABILITY

The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding