Sykes Pump Operations In New Zealand For Transport Infrastructure Recovery

sykes contractor
Facebook
LinkedIn
Email
Print

Sykes Group reported a successful project with our HH220i Pump Set operating in Kaikoura, New Zealand, on hire to NCTIR (North Canterbury Transport Infrastructure Recovery).

The Pump, with maximum head of 138m and maximum capacity of 282 L/sec has multiple purposes. In this application, it is being utilised to open the State Highway 1 between Kaikoura and Blenhiem, which are areas highly affected by the earthquakes.

The client’s objective is to build a concrete retaining wall of 1km along the highway. The Pump was commissioned to remove the ocean overflow off the road as quickly as possible to allow them to pour concrete between tides, within a challenging time frame.

NCTIR called Sykes Group team due to Sykes ability to deliver hard to match high volume pump, to keep up with the influx of water quickly enough to allow our client to pour the concrete. Due the Sykes strong market reputation and willingness to meet the urgent ​requirements of this demanding project , NCTIR made a decision to proceed with our equipment.

Additionally, our technical specialists designed and built a manifold adaptor to allow NCTIR site team to drain the water source down to around 60mm in depth and efficiently pour the concrete for the ocean wall. Once the HH220i has moved the bulk of the water, a smaller Sykes pump will be utilised along with this manifold​ allowing individual 2” Suction lines to be placed in the low areas to reduce the water to less than 60mm.

Sykes Group dedicated team continues to work in conjunction with client site operations to ensure the project is delivered in time, safely and with a focus on quality whistle ​ committed to continuous improvement.

For more information on the full range of pumps, please email sales or visit our ​website.

contact us

RECENT NEWS POSTS

The Industries we Serve

mining
Mining
Crane and construction site
Construction
Agriculture
Agriculture
Utilities
Utilities
sewage wastewater
Sewage & Wastewater

WHY Sykes Group?

award icon

DIRECT COMMUNICATION

Our in-house engineers and tech experts will work with you to create bespoke solutions for your project.

diamond icon

PREMIUM SPECIFICATIONS

Our pumps are designed to handle the most challenging and demanding environments. Using our in-house engineering team, we can custom-design pump packages to match any specification.

dollar icon

OPERATION AND MAINTENANCE COSTS

We design and manufacture pump packages that delivers optimal efficiency and minimal downtime. Even operating in harsh conditions, our products provide a safe and cost-effective solution.

menu icon

EQUIPMENT RANGE

We provide a wide range of pumps to handle all types of water-based issues. Whether above or below ground, Sykes Group can offer a solution.

shopping cart Icon

CUSTOMER SERVICE AND AFTERMARKET

If you need advice on a particular part, our parts and customer service technicians are always available to offer qualified, professional advice.

setting icon

STOCK AND MANUFACTURING

As the original equipment manufacturer (OEM), we keep plenty of stock on hand and can provide quick access to the parts you need.

Not sure where to start?

Global Sykes Offices

Newcastle

42 Munibung Rd, Cardiff NSW 2285

WEST AFRICA

Accra, Ghana

INDONESIA

Tangerang , Indonesia.

DUBAI, UAE

Plot S 50119
Jebel Ali Free Zone South

CHARLOTTE, USA

11000-A South Commerce B​lvd
Charlotte, NC 28273

KURRI KURRI

125 Mitchell Ave, Kurri Kurri NSW 2327

Copyright © 2024. All rights reserved.

Atlas logo
The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding