Switched On Lighting Solutions

led light towere
Facebook
LinkedIn
Email
Print

Offering the right product for the right application delivering the best performance is what we do best at Sykes Group.

In a recent project, our client Sydney Civil who were a lead company in the construction of the Sydney Olympic Village for the Olympic Games, was looking to expand the capabilities of their traffic management content. They were specifically after a mobile lighting solution that was proven, hard wearing and extremely well supported in the market place, but most importantly met the capabilities required.

Primarily, they needed a safe and bright tower to be used in pedestrian applications and to be positioned very close to a road intersection upgrade. This means, the lighting solution had to offer the highest level of light output without interfering in the line of sight of on-coming traffic. The specifications also required a compact and robust unit, with adjustable light heads, quiet, maneuverable and cost effective.

Our Sykes Group TL90 XTRA LED light tower, known as the second to none in the industry, proved to be the perfect fit for this project, delivering reliability, efficiency and meeting the exact volume of light our client expected for a safe road and pedestrian application.

With over 20 years of industry experience, Sydney Civil has hired light products which had come from multiple manufacturers, but ultimately as a result of the performance of the SMC TL90, the company chose to purchase their own equipment for this specific application.

Our client was fully satisfied with the mobile lighting solution and has placed them in an application which is expected to go for a period of approximately 12 months.

Sykes Group are proud to deliver products which offer the flexibility to meet clients’ specific needs with superior performance and efficiency.

For more information on the full range of lighting towers email sales@sykesgroup.com or visit our branch locator to speak with one of our sales and project experts.

contact us

RECENT NEWS POSTS

The Industries we Serve

mining
Mining
Crane and construction site
Construction
Agriculture
Agriculture
Utilities
Utilities
sewage wastewater
Sewage & Wastewater

WHY Sykes Group?

award icon

DIRECT COMMUNICATION

Our in-house engineers and tech experts will work with you to create bespoke solutions for your project.

diamond icon

PREMIUM SPECIFICATIONS

Our pumps are designed to handle the most challenging and demanding environments. Using our in-house engineering team, we can custom-design pump packages to match any specification.

dollar icon

OPERATION AND MAINTENANCE COSTS

We design and manufacture pump packages that delivers optimal efficiency and minimal downtime. Even operating in harsh conditions, our products provide a safe and cost-effective solution.

menu icon

EQUIPMENT RANGE

We provide a wide range of pumps to handle all types of water-based issues. Whether above or below ground, Sykes Group can offer a solution.

shopping cart Icon

CUSTOMER SERVICE AND AFTERMARKET

If you need advice on a particular part, our parts and customer service technicians are always available to offer qualified, professional advice.

setting icon

STOCK AND MANUFACTURING

As the original equipment manufacturer (OEM), we keep plenty of stock on hand and can provide quick access to the parts you need.

Not sure where to start?

Global Sykes Offices

Newcastle

42 Munibung Rd, Cardiff NSW 2285

WEST AFRICA

Accra, Ghana

INDONESIA

Tangerang , Indonesia.

DUBAI, UAE

Plot S 50119
Jebel Ali Free Zone South

CHARLOTTE, USA

11000-A South Commerce B​lvd
Charlotte, NC 28273

KURRI KURRI

125 Mitchell Ave, Kurri Kurri NSW 2327

Copyright © 2024. All rights reserved.

Atlas logo
The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding