Powered Mast Added for Nightshifter Finale

Facebook
LinkedIn
Email
Print

The Nightshifter NM4000 mobile lighting tower has been fitted with a powered mast to further improve site safety during overnight shifts, as infrastructure and roadwork contractors battle against increasingly demanding H&S regulations.

Originally launched with a manual mast in 2008 for international markets, 2000 of the 4kw Perkins-powered towers were shipped to overseas construction and light mining projects. Of those, 700 were snapped up by contractors in the Middle East.

Much of the NM4000 brand’s success stemmed from its durability and smaller footprint; which quickly made it the tower of choice for metropolitan projects where the need for compact design and mobility posed a problem for many other tower brands.

With the next generation hydraulic Allight Firefly tower heading into mass production, the Perth-based manufacturer’s decision to add a powered mast to a commemorative limited edition NM4000 for the Australian market, seemed a fitting finale, as Sales Director Paul Sowerby explained.

“The manual NM4000 tower made many friends across the Middle East, Africa and Indonesia, but wasn’t designed with our own domestic market’s more stringent operator safety standards in mind,” he said.

“When our new hydraulic Firefly range emerged from the design and R&D studios, it was clear that it would set exciting new standards of safety and portability in all our key global markets. It was at that point that we decided to bring the curtain down on the NM4000. Adding the powered mast to the final production run meant we could pay our last respects by offering the units to our special customers here at home.

“We tell ourselves that this business is all about analysing the customer’s needs and devising a solution to meet them. Normally, assessing a product’s growth prospects is a bit hit and miss, but at the moment, the biggest head-scratcher we have is to how to make the hydraulic Firefly quick enough. Needless to say, that’s not a challenge we mind having to juggle with.”

contact us

RECENT NEWS POSTS

The Industries we Serve

mining
Mining
Crane and construction site
Construction
Agriculture
Agriculture
Utilities
Utilities
sewage wastewater
Sewage & Wastewater

WHY Sykes Group?

award icon

DIRECT COMMUNICATION

Our in-house engineers and tech experts will work with you to create bespoke solutions for your project.

diamond icon

PREMIUM SPECIFICATIONS

Our pumps are designed to handle the most challenging and demanding environments. Using our in-house engineering team, we can custom-design pump packages to match any specification.

dollar icon

OPERATION AND MAINTENANCE COSTS

We design and manufacture pump packages that delivers optimal efficiency and minimal downtime. Even operating in harsh conditions, our products provide a safe and cost-effective solution.

menu icon

EQUIPMENT RANGE

We provide a wide range of pumps to handle all types of water-based issues. Whether above or below ground, Sykes Group can offer a solution.

shopping cart Icon

CUSTOMER SERVICE AND AFTERMARKET

If you need advice on a particular part, our parts and customer service technicians are always available to offer qualified, professional advice.

setting icon

STOCK AND MANUFACTURING

As the original equipment manufacturer (OEM), we keep plenty of stock on hand and can provide quick access to the parts you need.

Not sure where to start?

Global Sykes Offices

Newcastle

42 Munibung Rd, Cardiff NSW 2285

WEST AFRICA

Accra, Ghana

INDONESIA

Tangerang , Indonesia.

DUBAI, UAE

Plot S 50119
Jebel Ali Free Zone South

CHARLOTTE, USA

11000-A South Commerce B​lvd
Charlotte, NC 28273

KURRI KURRI

125 Mitchell Ave, Kurri Kurri NSW 2327

Copyright © 2024. All rights reserved.

Atlas logo
The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding