2018

2018

mining pump

With Water Rising Fast, We Rose to the Occasion

This is a story about amazing efficiency. It’s about achieving what should have been impossible. It’s about the Queensland team, who seamlessly worked together and focused totally on the customer’s changing needs. A story about delivering a powerful dewatering solution – to a remote mine-site in the wilds of PNG – four weeks ahead of […]

With Water Rising Fast, We Rose to the Occasion Read More »

pump mining

Remote mining operation receives the latest, next-generation pump.

In the South American countryside, there’s a large-scale, coal mining operation that requires some serious dewatering. In fact, the engineers at this massive, open-cut mine in Colombia needed a heavy-duty pump that could handle an extra high-head of over 170 metres. Even more, it needed to be very reliable and operate continuously, 24 hours a

Remote mining operation receives the latest, next-generation pump. Read More »

The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding