Sykes Group Supply Lighting Tower Solutions for Rio Tinto’s Project

mobile lighting towers
Facebook
LinkedIn
Email
Print

Sykes Group is please to showcase the completion of 20 Mine Spec Mobile Lighting Towers for Rio Tinto for their Silvergrass minesite.

​Our team worked consultatively with Rio Tinto to develop a solution that specifically met the needs of their site. Key features offered were an enormous light array consisting of 10 x 300W LED lights, full automation of machine deployment, and a huge 220 hours of run time. Customizations to meet Rio Tinto’s requirements included a purpose design dual axle trailer with hydraulic brakes, clear marking of service points and beacons to indicate machine status.

Following the successful supply of Lighting solutions for projects at their Yandi, Paraburdoo, West Angeles and Marandoo sites, the order was placed in December 2016 with ​completion date scheduled for June of 2017.

In February, Rio Tinto tasked Sykes Group to bring forward the delivery from June to support the accelerated schedule of their mine site.

By mobilizing our Supply Chain and Manufacturing teams, Sykes Group successfully completed the first 10 Towers by the end of March, supplying 50% of the order more than 60 days before the proposed date. The remaining balance was delivered over April and May, with Sykes Group team fulfilling the promise to keep our customers productive.

“The Mine Spec Mobile Light we build for Rio Tinto is an example of our focus on listening to our customers and using this feedback to continuously improve our offer, whether that be product design, specification or delivery times” Says Marcus West, Sykes Group Manufacturing and Production Manager

“The 10 head dual axle machine we have designed for Rio Tinto packs all of the great features of our robust 10M lighting tower into a compact, versatile footprint that can be towed behind any vehicle with a 2T towing capacity.” Says Latif Ahmad, Sykes Group Engineering and Quality Manager

For more information on our complete range of Lighting Towers please visit the our website at https://sykesgroup.com/

contact us

RECENT NEWS POSTS

The Industries we Serve

mining
Mining
Crane and construction site
Construction
Agriculture
Agriculture
Utilities
Utilities
sewage wastewater
Sewage & Wastewater

WHY Sykes Group?

award icon

DIRECT COMMUNICATION

Our in-house engineers and tech experts will work with you to create bespoke solutions for your project.

diamond icon

PREMIUM SPECIFICATIONS

Our pumps are designed to handle the most challenging and demanding environments. Using our in-house engineering team, we can custom-design pump packages to match any specification.

dollar icon

OPERATION AND MAINTENANCE COSTS

We design and manufacture pump packages that delivers optimal efficiency and minimal downtime. Even operating in harsh conditions, our products provide a safe and cost-effective solution.

menu icon

EQUIPMENT RANGE

We provide a wide range of pumps to handle all types of water-based issues. Whether above or below ground, Sykes Group can offer a solution.

shopping cart Icon

CUSTOMER SERVICE AND AFTERMARKET

If you need advice on a particular part, our parts and customer service technicians are always available to offer qualified, professional advice.

setting icon

STOCK AND MANUFACTURING

As the original equipment manufacturer (OEM), we keep plenty of stock on hand and can provide quick access to the parts you need.

Not sure where to start?

Global Sykes Offices

Newcastle

42 Munibung Rd, Cardiff NSW 2285

WEST AFRICA

Accra, Ghana

INDONESIA

Tangerang , Indonesia.

DUBAI, UAE

Plot S 50119
Jebel Ali Free Zone South

CHARLOTTE, USA

11000-A South Commerce B​lvd
Charlotte, NC 28273

KURRI KURRI

125 Mitchell Ave, Kurri Kurri NSW 2327

Copyright © 2024. All rights reserved.

Atlas logo
The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding