Deep-pit pumping: let’s look at the bigger picture!

mine site africa
Facebook
LinkedIn
Email
Print
It’s true; a picture really can speak a thousand words.

One look at the photograph below and the story is very clear: open-cut mining in Africa needs a heavy-duty dewatering solution. See the full details further below…

Now, for the finer detail of the pumping system – including the proposed Sykes Group upgrade to make the system even more powerful….

It’s a copper mine in the Democratic Republic of Congo (DRC), in the heart of central Africa. The epic photograph was taken by Sebastian Graham, Sykes Group Regional Sales Manager – West Africa.

With Peter Breen, General Manager – African Sales, they were on-site to conduct de-watering training sessions with mine management and staff. They also undertook a comprehensive on-site dewatering audit to ascertain if the present system was operating to capacity.

“This area experiences very-high rainfall during the wet season, so a good dewatering plan is essential for this mine to effectively operate” said Peter.

“Even during the dry season, groundwater seepage is constant, so working with the mine’s production department, it was time for a full operational audit.

“We also discussed a proposed dewatering strategy to prepare for a 100 year rain event – getting ready for the type of extreme weather that happens once a century and brings an unprecedented volume of water” he explained.

At present, there’s seven XH200 pumps on-site all powered by C27 CAT engines. “Even more, there’s two SS24K-12 light towers – all supplied by Sykes Group Africa” added Sebastian.

The current dewatering system consists of four heavy-duty XH200 pumps on the pit floor “feeding a large stage-tank at the 65m bench” continued Peter, “From that point, another three XH200 pumps push the water another 120m up the pit face to a discharge point 100m away”.

Whilst still performing effectively on a daily basis, this current system does offer room for improvement, “especially in-light of the 100 year rain event planning strategy” observed Peter.

“As the pit continues to deepen, we’re now looking at installing even larger HH300 pumps at the pit floor – the performance curve dynamic is more suited to this extra-high head.

“The high flow available from the larger HH300 pumps would result in just two pumps being needed, instead of the four pumps currently in place.

“And if room permits a pontoon based pump would be ideal to support their needs going forward” said Peter.

To discuss large-scale mine site dewatering anywhere on the African continent, contact Peter Breen, Sykes Group EGM Sales – Africa. Call +27 (0) 78 120 1470 or email peter.breen@sykesgroup.com

contact us

RECENT NEWS POSTS

The Industries we Serve

mining
Mining
Crane and construction site
Construction
Agriculture
Agriculture
Utilities
Utilities
sewage wastewater
Sewage & Wastewater

WHY Sykes Group?

award icon

DIRECT COMMUNICATION

Our in-house engineers and tech experts will work with you to create bespoke solutions for your project.

diamond icon

PREMIUM SPECIFICATIONS

Our pumps are designed to handle the most challenging and demanding environments. Using our in-house engineering team, we can custom-design pump packages to match any specification.

dollar icon

OPERATION AND MAINTENANCE COSTS

We design and manufacture pump packages that delivers optimal efficiency and minimal downtime. Even operating in harsh conditions, our products provide a safe and cost-effective solution.

menu icon

EQUIPMENT RANGE

We provide a wide range of pumps to handle all types of water-based issues. Whether above or below ground, Sykes Group can offer a solution.

shopping cart Icon

CUSTOMER SERVICE AND AFTERMARKET

If you need advice on a particular part, our parts and customer service technicians are always available to offer qualified, professional advice.

setting icon

STOCK AND MANUFACTURING

As the original equipment manufacturer (OEM), we keep plenty of stock on hand and can provide quick access to the parts you need.

Not sure where to start?

Global Sykes Offices

Newcastle

42 Munibung Rd, Cardiff NSW 2285

WEST AFRICA

Accra, Ghana

INDONESIA

Tangerang , Indonesia.

DUBAI, UAE

Plot S 50119
Jebel Ali Free Zone South

CHARLOTTE, USA

11000-A South Commerce B​lvd
Charlotte, NC 28273

KURRI KURRI

125 Mitchell Ave, Kurri Kurri NSW 2327

Copyright © 2024. All rights reserved.

Atlas logo
The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding