SykesPrimax Dewatering Project in Qatar

priming pump
Facebook
LinkedIn
Email
Print

Hydroserv is into the dewatering and rental business in Qatar, spreading their wings to other geographical areas like Azerbaijan, Oman, Kuwait and UAE for the last six months. They currently hold a fleet of around 200 plus pumps of different sizes, primarily from BBA Holland.

During April 2017, they have approached us for a new dewatering project where a high volume dewatering solution was required, with total pumping volume of around 2500 m3/hr. Sykesprimax pumping team provided the solution with five CP220i units, each delivering 500 m3/hr with a total dynamic head of 35 M. Our team were involved from the design phase of the system, including the system head calculations and discharge pipelines to production. Out of the five units, two were of acoustic ones to meet the stringent noise requirements, as the project was taking place in the diplomatic areas of Doha. The units have recorded a sound level of 65 dBA at 7 M while testing at our facility.

The pumps were put into operation immediately after the delivery and are doing a commendable job since then. The high efficiency semi open solid handling stainless steel impeller is giving them a great performance over equivalent BBA units. Additionally, the material is compatible with the pumping media (saline water) which gives them piece of mind as they were regularly facing issues with corrosion due to high salinity.

“The overall dealings and communications was no different to any other previous projects with Sykesprimax. I always felt comfortable and approachable with them for any product/technical clarifications which they responded in a timely manner. These pumps were delivered and deployed on time. At Hydroserve, we always value the quality and the workman ship of the product for which Sykesprimax stands out. The whole project was transparent from end to end and was completed smoothly without any hurdles. Whatever Hydroserve opted for during the requirement phase has been delivered as promised. Looking forward to work with Sykesprimax on future projects” -reported Barry Sullivan, Hydroserv’s Engineering Director.

For more information on our complete range of pumps and generators, please contact us at 1300 255 444 or visit our website at https://sykesgroup.com/.

contact us

RECENT NEWS POSTS

The Industries we Serve

mining
Mining
Crane and construction site
Construction
Agriculture
Agriculture
Utilities
Utilities
sewage wastewater
Sewage & Wastewater

WHY Sykes Group?

award icon

DIRECT COMMUNICATION

Our in-house engineers and tech experts will work with you to create bespoke solutions for your project.

diamond icon

PREMIUM SPECIFICATIONS

Our pumps are designed to handle the most challenging and demanding environments. Using our in-house engineering team, we can custom-design pump packages to match any specification.

dollar icon

OPERATION AND MAINTENANCE COSTS

We design and manufacture pump packages that delivers optimal efficiency and minimal downtime. Even operating in harsh conditions, our products provide a safe and cost-effective solution.

menu icon

EQUIPMENT RANGE

We provide a wide range of pumps to handle all types of water-based issues. Whether above or below ground, Sykes Group can offer a solution.

shopping cart Icon

CUSTOMER SERVICE AND AFTERMARKET

If you need advice on a particular part, our parts and customer service technicians are always available to offer qualified, professional advice.

setting icon

STOCK AND MANUFACTURING

As the original equipment manufacturer (OEM), we keep plenty of stock on hand and can provide quick access to the parts you need.

Not sure where to start?

Global Sykes Offices

Newcastle

42 Munibung Rd, Cardiff NSW 2285

WEST AFRICA

Accra, Ghana

INDONESIA

Tangerang , Indonesia.

DUBAI, UAE

Plot S 50119
Jebel Ali Free Zone South

CHARLOTTE, USA

11000-A South Commerce B​lvd
Charlotte, NC 28273

KURRI KURRI

125 Mitchell Ave, Kurri Kurri NSW 2327

Copyright © 2024. All rights reserved.

Atlas logo
The Sykes Group will be conducting a scheduled ERP system upgrade on November 6 and 7, 2024. As a result, there may be delays in order confirmation and despatch. We sincerely apologise for any inconvenience this may cause.
Our email service may be experiencing some temporary disruption on July 18 and 19 due to an IT system changeover. If you receive a non-delivery receipt, please call your Sykes/Primax contact or try again later during the day. Thank you for your understanding